Related Case Studies
Construction Projects using YZ-90D Hydraulic Vibratory Hammer
Building Construction in Cangnan Industrial Zone - Project time: January, 2015
- Pile type: U-piles
- Pile length: 15m
- Pile weight: 1.14 ton
- Thickness: 15.5mm
- Pile extraction time: approximately 10 min per pile
Sea Piling in Highway Construction - Project time: April, 2018
- Diameter: 400 mm
- Pile type: steel tubular piles and sheet piles
- Pile length:18 m
Construction Projects using YZ-110D Hydraulic Vibratory Hammer
Railway Construction in Jiangxi Province - Project time: December, 2022
- Pile type: steel tubular piles
- Diameter: 800 mm
- Pile length: 12 m (driving depth: 8 m)
- Application: trestle bridge
- Soil type: red soil
- Pile sinking time: 15-20 min
Hengqin Bridge Construction in Guangdong Province - Project time: July, 2022
- Pile type: steel tubular piles
- Diameter: 1020 mm
- Pile Thickness: 12 mm
- Pile length: 22 m
- Application: trestle bridge (pile extraction with vibratory hammers)
- Soil type: clay
- Pile extraction time: 15-20 min
High-speed Railway Construction in Shanghai City - Project time: June, 2022
- Pile type: steel tubular piles
- Diameter: 800 mm
- Pile length: 23 m (driving depth: 20 m)
- Application: offshore cofferdam
- Soil type: quick sand
- Pile extraction time: about 1h