Double Girder Overhead Crane
Request a Quote
About Us: http://zgtostacrane.com
Double girder overhead cranes are usually used in open warehouses, railways and other places to carry out common loading, unloading and material handling tasks. It is a heavy-duty bridge crane that is frequently used.
Specification
Overhead Crane (5-50t)
Lifting Capacity | ton | 5 | 10 | 16 | 20 | 32 | 50 |
Span | S(m) | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 |
Lifting height | m | 6~16 | 6~16 | 6~16 | 6~16 | 6~18 | 6~16 |
Lifting speed | m/min | 11.5 | 8.5 | 7.9 | 7.2 | 6 | 6 |
Trolley travelling speed | m/min | 37.2 | 37.4 | 40.1 | 40 | 37 | 31.3 |
Crane travelling speed | m/min | 70.6 | 70.6 | 74.3 | 75.1 | 64.9 | 58.5 |
Work class | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | |
Track type | P38 | P38 P43 | P43 | P43 | QU70 | QU80 |
Overhead Crane(75-250t)
Lifting Capacity | ton | 75 | 100 | 125 | 160 | 200 | 250 |
Span | S(m) | 10.5~31.5 | 13~31 | 13~31 | 13~31 | 13~31 | 13~31 |
Lifting height | m | 6~20 | 6~20 | 6~20 | 6~22 | 6~20 | 6~20 |
Lifting speed | m/min | 3.9 | 3.1 | 3.9 | 3.5 | 2.6 | 2.2 |
Trolley travelling speed | m/min | 31.3 | 33.6 | 33 | 40 | 32 | 32 |
Crane travelling speed | m/min | 61 | 61.8 | 62.3 | 68 | 48 | 50 |
Work class | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | |
Track type | QU100 | QU100 | QU100 | QU120 | QU120 | QU120 |
Overhead Crane(300-450t)
Lifting Capacity | ton | 300 | 350 | 400 | 450 |
Span | S(m) | 13~31 | 13~31 | 13~31 | 13~31 |
Lifting height | m | 6~24 | 6~24 | 6~30 | 6~30 |
Lifting speed | m/min | 2.4 | 2.2 | 2.6 | 2.1 |
Trolley travelling speed | m/min | 28 | 28 | 31 | 27 |
Crane travelling speed | m/min | 42 | 42 | 45 | 42 |
Work class | A3~A7 | A3~A7 | A3~A7 | A3~A7 | |
Track type | QU120 | QU120 | QU120 | QU120 |
Features
- Excellent performance
- Reasonable structure
- Quality, safe and reliable
- Easy to maintain
- Parts can be replaced
Advantages
- Widely used for handling materials in industries' workshop and warehouse
- Load capacity can be up to 500t, the maximum span up to 35 m
- Reduce the overall investment of the plant, improve production efficiency, reduce maintenance costs save operating energy consumption, and obtain a better return on investment
Related products
Send Message
Most Recent
More
Other Products
Videos